- Projekt neve:
- Mustla Bridge
- Helyszín:
- Estonia
- Kivitelezés időpontja:
- 2019
- Tervező:
- Geoman Ltd.
- Projekt leírása:
- Reinforced Earth retaining structure using Redi-Rock PC System (Positive Connection)
Length of the whole structure: 44,5m
Height (including base block): 4,6 m
The Redi-Rock PC is a reinforced earth retaining wall solution based on the standard Redi-Rock segmental mass-gravity system. A 300mm wide strip of geogrid is pulled through the core of the block and is laid with a layer level with the base of the block and one at the top. Any tension is balanced by that in the other layer, preventing the grid from being pulled through the block. This creates a strong, consistent facing connection that does not vary in capacity with depth. - Szoftver:
-
GEO 5 - Redi-Rock Fal
- Fájlok:
-
redi-rock-wall-estonia-bridge-abutment.pdf
Redi-Rock Wall - Mustla Bridge Abutment Design, Estonia
Project Gallery Leaflet - Mustla Bridge Estonia
Metro Line C, Prague, Czech Republic
- Projekt neve:
- Construction of Metro Line C
- Helyszín:
- Prague - Ladvi - Letnany, Czech republic
- Kivitelezés időpontja:
- 2002–2007
- Tervező:
- METROPROJEKT Praha, a. s.,
Ing. Jaroslav Kopecny - Szoftver:
-
GEO 5 - Szádfal tervezés
GEO 5 - Szádfal ellenőrzés
Project Gallery Leaflet - Prague Metro line C
Concrete sewer, Slatina, Romania
- Projekt neve:
- Concrete sewer - Slatina
- Helyszín:
- Slatina, jud. Olt, Romania
- Kivitelezés időpontja:
- 2014
- Tervező:
- Proexrom, Romania
- Szoftver:
-
GEO 5 - Talajszegezés
Project Gallery Leaflet - Concrete Sewer
Nádraží Veleslavín Station, Prague, Czech Republic
- Projekt neve:
- Nádraží Veleslavín Station, Metro V.A, Prague
- Helyszín:
- Prague, Czech Republic
- Kivitelezés időpontja:
- 2011 - 2014
- Tervező:
- Metroprojekt Praha a.s.
Ing. Martina Urbánková - Projekt leírása:
- Three-aisled station
Length: 100m
Maximum width: 22.34 m
Maximum height: 10.25 m
Side of the excavation area 70.6 m2
Secondary excavation area 42.9 m2 - Szoftver:
-
GEO 5 - FEM
Project Gallery Leaflet - Nádraží Veleslavín Metro Station
Line 4 Metro, Budapest, Hungary
- Projekt neve:
- Budapest Metro Line 4
- Helyszín:
- Keleti Railway Station - Budapest, Hungary
- Kivitelezés időpontja:
- 2007
- Tervező:
- Goda Balázs, Honti Imre, Huszka Gábor Főmterv Zrt.
- Szoftver:
-
GEO 5 - Szádfal ellenőrzés
Tunnel at the Intersection of King Abdulaziz Road with Abu Baker Road, Saudi Arabia
- Projekt neve:
- Tunnel at the Intersection of King Abdulaziz Road with Abu Baker Road
- Helyszín:
- Saudi Arabia
- Kivitelezés időpontja:
- 2017-2018
- Tervező:
- Civil Engr. Al-Hussain Hassan
- Projekt leírása:
- Tunnel Length:650 M
Depth of excavation: 15.0m
Number of rows of anchors: 5
Distance between anchors: 3.0m
Contractor: Jeddah Foundation Company - Szoftver:
-
GEO 5 - Szádfal ellenőrzés
Bridge “Las Ferias Av”, Venezuela
- Projekt neve:
- Bridge “Las Ferias Av”
- Helyszín:
- Valencia City, Venezuela
- Kivitelezés időpontja:
- 2015
- Tervező:
- Sismica C.A. Ing. Edinson Guanchez (Msc, Esp)
- Projekt leírása:
- Total Deck Length = 139 m (4 spans)
Maximum span length = 36 m
Access Ramps Length = 250 m
Total Bridge Length = 389 m - Szoftver:
-
GEO 5 - Rézsűállékonyság
GEO 5 - MSF Fal
GEO 5 - Hídfő
GEO 5 - Cölöpök
GEO 5 - Cölöpcsoport
- Fájlok:
-
additional-description-and-drawings.pdf
Deep Excavation in Prishtina, Kosovo
- Projekt neve:
- Deep Excavation - Anchored Diaphragm Wall
- Helyszín:
- Prishtina, Kosovo
- Kivitelezés időpontja:
- 2018
- Tervező:
- "Geotest Engineering", Prishtinë
Dr. Ing. Qani V. Kadiri
Ing. Adrian Kadiri - Projekt leírása:
- Depth of excavation: 19.5m
Thickness of diaphragm wall: 0.6m
Number of rows of anchors: 5
Distance between anchors: 2.5m
- Szoftver:
-
GEO 5 - Rézsűállékonyság
GEO 5 - Szádfal ellenőrzés
- Fájlok:
-
deep-excavation-in-prishtina.pdf
12-meter high Gabion Wall, Mexico
- Projekt neve:
- 12-meter high Gabion Wall
- Helyszín:
- Guanajuato, Gto. México
- Kivitelezés időpontja:
- 2015
- Tervező:
- Ing. Pedro J. Villarreal Pinzón
TREE CONTACTO S.A. DE C.V. - Szoftver:
-
GEO 5 - Gabion
- Fájlok:
-
PDF - GEO5 - Gabion report
Athienou Sewage Treatment Plant and associated works, Cyprus
- Projekt neve:
- Athienou Sewage Treatment Plant and associated works
- Helyszín:
- Cyprus
- Kivitelezés időpontja:
- 2015 - 2017
- Tervező:
- Ioannis Pericleous, MSc, CEng, MIStructE
- Projekt leírása:
- The project was a Design, Build, Operate contract and it included a sewage treatment plant with RC water tanks, one water retaining earth lagoon with capacity 100.000m3 and one 3.000m3. Project also included the design of several other associated works, such roads, 4no. Pumping stations located in Athienou community approx. 8m deep each, building irrigation network, etc.
- Szoftver:
-
GEO 5 - Rézsűállékonyság
GEO 5 - Süllyedés
-
Office buildings, Madrid, Spain
- Projekt neve:
- Construction office buildings “Quinta de los Molinos”
- Helyszín:
- Madrid, España
- Kivitelezés időpontja:
- 2004-2005
- Tervező:
- Daniel Danés Grases
- Szoftver:
-
GEO 5 - FEM
GEO 5 - Talajszegezés
Drilled piles, Brasilia, Brazil
- Projekt neve:
- Drilled piles
- Helyszín:
- Brasilia, Brazil
- Kivitelezés időpontja:
- 2003–2005
- Tervező:
- Renato P. Cunha, MSc, PhD
- Szoftver:
-
GEO 5 - Szádfal tervezés
GEO 5 - Szádfal ellenőrzés
Gabion revetments, Ostrowo, Poland
- Projekt neve:
- Gabion revetments – Jastrzębia Góra – Ostrowo
- Helyszín:
- Jastrzębia Góra – Ostrowo, Poland
- Kivitelezés időpontja:
- 2012
- Tervező:
- INGEO Sp. z o.o.
Dr. Ing. Marcin Blockus - Szoftver:
-
GEO 5 - Gabion
- Fájlok:
-
geo5-report-ostrowo.pdf
High-rise building, Istanbul, Turkey
- Projekt neve:
- High-rise building
- Helyszín:
- Istanbul, Turkey
- Kivitelezés időpontja:
- 2007
- Tervező:
- NYS Project Consultancy and Constracting Co.
Ing. Yavuz Seymen - Szoftver:
-
GEO 5 - Szádfal tervezés
GEO 5 - Szádfal ellenőrzés
High-rise building Soyak, Istanbul, Turkey
- Projekt neve:
- High-rise building Soyak
- Helyszín:
- Istanbul, Turkey
- Kivitelezés időpontja:
- 2011-2012
- Tervező:
- NYS Constructıon
- Projekt leírása:
- Excavation depth: 32,5m
Piles installed: 10,700m
Anchors installed: 71,000m
Soil excavation: 205.000 m3 - Szoftver:
-
GEO 5 - Szádfal ellenőrzés
Kanianka dam, Slovakia
- Projekt neve:
- Kanianka dam
- Helyszín:
- Town of Kanianka, Slovakia
- Kivitelezés időpontja:
- 2004
- Tervező:
- Overall verification: Ing. Andrej Kasana
- Szoftver:
-
GEO 5 - Rézsűállékonyság
GEO 5 - FEM
New Connection, Prague, Czech Republic
- Projekt neve:
- New Connection Prague
- Helyszín:
- Prague Main Station - Masaryk’s Station – Liben - Vysocany, Czech republic
- Kivitelezés időpontja:
- 2004–2010
- Tervező:
- Ing.Miroslav Sedivy
- Szoftver:
-
GEO 5 - FEM
Pedestrian tunnel, Gdansk, Poland
- Projekt neve:
- Pedestrian tunnel – Gdansk
- Helyszín:
- Gdańsk, Poland
- Kivitelezés időpontja:
- 2013
- Tervező:
- INGEO Sp. z o.o.
Dr. Ing. Marcin Blockus - Szoftver:
-
GEO 5 - FEM – Alagút
Q22 Excavation Pit, Warsaw, Poland
- Projekt neve:
- Q22 Excavation Pit, Warsaw, Poland
- Helyszín:
- Warsaw, Poland
- Kivitelezés időpontja:
- 2013 - 2016
- Tervező:
- Buro Happold Polska Sp. z o.o.
Maciej Sobotkowski, MSc. Eng.
Zbigniew Czajewski, MSc. Eng. - Projekt leírása:
- 155 meters high office building with 5 underground levels. The depth of the excavation pit is more than 20 meters.
- Szoftver:
-
GEO 5 - Szádfal ellenőrzés
Retaining walls RediRock, Newport, USA
- Projekt neve:
- Sanville memorial public works facility
- Helyszín:
- Newport, USA
- Kivitelezés időpontja:
- 2008
- Tervező:
- Souhegan Valley Engineering Inc.
New Hampshire, Newport USA - Szoftver:
-
-
Shopping Center and Housing Project, Antalya, Turkey
- Projekt neve:
- Shopping Center
- Helyszín:
- Antalya, Turkey
- Kivitelezés időpontja:
- 2009-2010
- Tervező:
- NYS Constructıon
- Projekt leírása:
- Excavation depth: 24m
Bored Piles installed: 18,000m
Anchors installed: 108,000m - Szoftver:
-
GEO 5 - Szádfal ellenőrzés
Temporary containment of terrain, Tenerife Norte, Spain
- Projekt neve:
- Temporary containment of terrain
- Helyszín:
- Valle Colino, Tenerife Norte, Spain
- Kivitelezés időpontja:
- 2006
- Tervező:
- Francisco Javier Cruz García
- Szoftver:
-
GEO 5 - Talajszegezés
Tesare dam, Tesare, Slovakia
- Projekt neve:
- Tesare dam
- Helyszín:
- Town of Tesare, Slovakia
- Kivitelezés időpontja:
- 2004
- Tervező:
- Overall verification: Ing. Andrej Kasana
- Szoftver:
-
GEO 5 - Rézsűállékonyság
GEO 5 - FEM
Tunnel ventilation access, Lérida, Spain
- Projekt neve:
- Tunnel ventilation in AVE and Lérida access
- Helyszín:
- Avenue Once de Septiembre, Lérida, España
- Kivitelezés időpontja:
- 2008
- Tervező:
- Ignacio Zuloaga
- Szoftver:
-
GEO 5 - FEM
VMO Dobrovského, Prague, Czech Republic
- Projekt neve:
- VMO Dobrovského Brno
- Helyszín:
- Road I/42 Brno, Czech republic
- Kivitelezés időpontja:
- 2002–2005
- Tervező:
- Ing. Jaroslav Lacina
- Szoftver:
-
GEO 5 - FEM
Waterworks Hosterwitz, Dresden, Germany
- Projekt neve:
- Waterworks Hosterwitz
- Helyszín:
- Dresden - Hosterwitz, Germany
- Kivitelezés időpontja:
- 2012
- Tervező:
- G.E.O.S. Ingenieurgesellschaft mbH
Dipl. – Ing. Juraj Ortuta, Dipl. – Ing. Andreas Köhler - Projekt leírása:
- Safety assessment of complex of buildings for planned increase of flood control waterworks Hosterwitz.
- Szoftver:
-
GEO 5 - FEM
Newry, Ireland - Dominican Chapel, Ireland
- Projekt neve:
- Newry, Ireland - Dominican Chapel
- Helyszín:
- Newry, Northern Ireland
- Kivitelezés időpontja:
- 2017
- Tervező:
- Geoman Ltd.
Liam K.D. - Projekt leírása:
- Landscaping by MacWall system with NFC Fill.
Wall height: from 1.8 m to 3.6 m
Total number of walls: 5
- Szoftver:
-
GEO 5 - Rézsűállékonyság
GEO 5 - MSF Fal
- Fájlok:
-
PDF - Additional information about the project (detailed description, photos, documentation)
El Cerrillo Park Comenar Viejo, Spain
- Projekt neve:
- El Cerrillo Park Comenar Viejo
- Helyszín:
- Madrid, Spain
- Kivitelezés időpontja:
- 2019
- Tervező:
- Wall Designer: Geoman Ltd.
Redi-Rock Supplier: Memorial Parks - Projekt leírása:
- Reinforced retaining wall using Redi-Rock PC System (Positive Connection)
Length of the whole structure: 70,2m
Max. height: 5,02 m
GEO5 Prefab Wall was used to assess the suitability of sheets of Geotextile reinforcement with a friction connection between blocks when the walls surpassed achievable heights using mass gravity, the Redi-Rock Wall module was used for standard Gravity analysis while the Stability Module provided global analysis for all sections considered.
The wall was founded on competent medium-dense granite sand and designed using the Spanish adaption of EC7 (UNE-EN 1997-1:2004) and associated annex.
The local soil group is described as Leptosols. The soil unit was described as Lithic and Dystric. - Szoftver:
-
GEO 5 - Rézsűállékonyság
GEO 5 - Előregyártott fal
Brantham, Suffolk - Two reinforced walls, UK
- Projekt neve:
- Brantham, Suffolk - Two reinforced walls
- Helyszín:
- Brantham, Suffolk, UK
- Kivitelezés időpontja:
- 2021
- Tervező:
- Kenneth Knox, Stabilisure Ltd.
- Projekt leírása:
- Two 5.3m high, 70m long Rootlok hybrid nailed MSE walls at Stour view.
Number of rows of soil nails: 7
Nails distance: approx. 80cm
Total length of the supporting structure: 70m - Szoftver:
-
GEO 5 - Rézsűállékonyság
GEO 5 - MSF Fal
- Fájlok:
-
PDF - Additional information about the project (detailed description, photos, documentation)
Allenton, Derby - Ecocrib retaining wall, UK
- Projekt neve:
- Allenton, Derby - Ecocrib retaining wall
- Helyszín:
- Allenton, Derby, UK
- Kivitelezés időpontja:
- 2020
- Tervező:
- William Morrow (Geoman Ltd.)
Installer/ material supplier: PC Construction - Projekt leírása:
- Ecocrib retaining wall - 100% recycled mixed polymer retaining crib wall system.
Maximum retained height: 4.1m
Total length: 50m - Szoftver:
-
GEO 5 - Rézsűállékonyság
GEO 5 - Előregyártott fal
- Fájlok:
-
PDF - Additional information about the project (detailed description, photos, documentation)
Lawley Village Phase 10, Telford, UK
- Projekt neve:
- Lawley Village Phase 10, Telford
- Helyszín:
- Lawley Village, Telford
- Kivitelezés időpontja:
- 2021
- Tervező:
- Kenneth Knox
Geoman Ltd. - Projekt leírása:
- Height of reinforced slope: up to 6m
Total length of the slope: 300m
Slope stabilization technology: soil bag facing - Szoftver:
-
GEO 5 - Rézsűállékonyság
GEO 5 - MSF Fal
- Fájlok:
-
PDF - Additional information about the project (detailed description, photos, documentation)
Building of World Trade Center Asuncion
- Projekt neve:
- Building of World Trade Center Asuncion
- Helyszín:
- Asunción - Paraguay
- Kivitelezés időpontja:
- 2012
- Tervező:
- Ing. Augusto J. Leoni
- Projekt leírása:
- Pile curtain with not pre-tensioned (passive) anchors.
Depth of excavation: 16 m
Diameter of piles: 0.23 m
Piles spacing: 0.90 m
Number of rows of anchors: 5
Distance between anchors: 2.50 m - Szoftver:
-
GEO 5 - Rézsűállékonyság
GEO 5 - Szádfal ellenőrzés
Expansion of shopping center Shopping del Sol
- Projekt neve:
- Expansion of shopping center Shopping del Sol
- Helyszín:
- Asunción - Paraguay
- Kivitelezés időpontja:
- 2014
- Tervező:
- Ing. Augusto J. Leoni
- Projekt leírása:
- Pile curtain with pre-tensioned (active) anchors.
Deep of excavation: from 14 to 18 m
Diameter of piles: 0,23 m
Piles spacing: 0,90 m
Number of rows of anchors: 4
Distance between anchors: Variable - Szoftver:
-
GEO 5 - Rézsűállékonyság
GEO 5 - Szádfal ellenőrzés
Apartment house Eminent
- Projekt neve:
- Apartment house Eminent - Asunción
- Helyszín:
- Asunción - Paraguay
- Kivitelezés időpontja:
- 2015
- Tervező:
- Ing. Augusto J. Leoni
- Projekt leírása:
- Pile curtain with pre-tensioned (active) anchors.
Deep of excavation: from 14 m
Diameter of piles: 0.23 m
Piles spacing: 0.90 m
Number of rows of anchors: 5
Distance between anchors: Variable - Szoftver:
-
GEO 5 - Rézsűállékonyság
GEO 5 - Szádfal ellenőrzés
Paseo del Bajo parking in front of the Casa Rosada
- Projekt neve:
- Paseo del Bajo parking in front of the Casa Rosada
- Helyszín:
- Argentina - Buenos Aires
- Kivitelezés időpontja:
- 2019
- Projekt leírása:
- The construction pit is in close proximity to the historic sewerage system, which is more than 100 years old. The front of the excavation at a distance of only 6m from the sewer.
Depth of excavation: 10,5 m
Number of rows of anchors: 4
Distance between anchors: 2.50 m - Szoftver:
-
GEO 5 - FEM
GEO 5 - Szádfal ellenőrzés
Design of a Rock Slope
- Projekt neve:
- Design of a Rock Slope
- Helyszín:
- Guizhou Province, China
- Kivitelezés időpontja:
- 2016 - 2017
- Tervező:
- Guizhou Metallurgical Design and Research Institute
- Projekt leírása:
- Rock slope stabilization using anchored reinforced concrete beams with two rows anti-slide piles at the lower edge of the slope.
- Szoftver:
-
GEO 5 - Rézsűállékonyság
GEO 5 - FEM
GEO 5 - Nem-elcsúszó Cölöp
- Fájlok:
-
Output protocol from the GEO5 Slope Stability program
Slope stabilization using three rows of Anti-slide piles
- Projekt neve:
- Slope stabilization using three rows of Anti-slide piles
- Helyszín:
- Jiangsu Province, China
- Kivitelezés időpontja:
- 2016
- Tervező:
- Geological Engineering Investigation of Jiangsu Province
- Projekt leírása:
- Slope stabilization with three rows of Anti-slide piles. Three separate series of stabilization piles: Pile diameter: 1m, 1m, 1.5m Pile depth: 9m, 11m, 15m Stabilization pile wall width: 19m, 27m, 33m Length of the stabilized part of the slope: approx. 120m
- Szoftver:
-
GEO 5 - Rézsűállékonyság
GEO 5 - Nem-elcsúszó Cölöp
- Fájlok:
-
Output protocol from the GEO5 Slope Stability program
Shanghe Hanghu East Station - Retaining Wall
- Projekt neve:
- Shanghe Hanghu East Station - Retaining Wall
- Helyszín:
- Zhejiang Province, China
- Kivitelezés időpontja:
- 2014 - 2016
- Tervező:
- China Railway Siyuan Survey and Design Group Co., Ltd.
- Projekt leírása:
- Slope supporting structures at the railway corridor. Retaining reinforced concrete wall based on piles and reinforced MSE wall. Depth of foundation piles: 18.5 m Height of the reinforced retaining wall: 4.6 m Height of MSE wall: 4.6 m Number of rows of geo-reinforcements: 4 Reinforcement length: 4m
- Szoftver:
-
GEO 5 - MSF Fal
GEO 5 - Szögtámfal
GEO 5 - Cölöpök
- Fájlok:
-
Output protocol from the GEO5 Cantilever wall and MSE wall program
Niuzhaishan Tunnel
- Projekt neve:
- Niuzhaishan Tunnel
- Helyszín:
- Fujian Province, China
- Kivitelezés időpontja:
- 2012 - 2014
- Tervező:
- Geological Engineering Investigation of Fujian Province
- Projekt leírása:
- The Niuzhaishan Tunnel in total length 1,697 m.
The double arc-tube highway tunnel will span four lanes in each direction.
Excavation tube width: 32 m.
Excavation tube height: 22,5 m. - Szoftver:
-
GEO 5 - FEM
GEO 5 - FEM – Alagút
GEO 5 - Rétegtan
- Fájlok:
-
China Niuzhaishan Tunnel Output Report
Construction of Expressway S7, Poland
- Projekt neve:
- Construction of Expressway S7, Koszwały-Nowy Dwór Gdański
- Helyszín:
- Poland
- Kivitelezés időpontja:
- 2018
- Tervező:
- INGEO Sp. z o.o.
Dr. Ing. Marcin Blockus - Projekt leírása:
- Stabilization of the expressway subsoil using a group of piles.
Pile diameter: 0,40m
Number of drilled displament piles: 186000
- Szoftver:
-
GEO 5 - FEM
- Fájlok:
-
poland-subsoil-stabilization-expressway.pdf